Phase Transition installation images

We worked on the installation of the show at the Butler for 4 days. These three large pieces had never been installed before (at least not in this format) so there were a lot of uncertainties. Thanks to Ed and Wayne - preparators at the Butler for all their help and expertise.

Installing the tracks and brackets to support the chimes and pulleys.Installation of the ceiling template for Fort Peck with Ed Hallihan.
Beginning to string up the individual sections of Fort Peck. The initial system was abandoned after a full day of work and we switched to pre-measured lengths of line for a marathon last day of installation.
Almost finished installing with Wayne Gruver.